You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Lenovo LeSI rack solution AC power cycle Work Instruction
0: clear all SEL log in XCC and in SMM
[root@mgt ~]# reventlog all clear
node06: SEL cleared
node01: SEL cleared
node04: SEL cleared
node03: SEL cleared
node02: SEL cleared
node08: SEL cleared
node07: SEL cleared
node05: SEL cleared
[root@mgt ~]# reventlog smm clear
smm02: SEL cleared
smm01: SEL cleared
1: power all node off with ipmi command (node DC off )
[root@mgt ~]# rpower all off
node04: off
node03: off
node02: off
node07: off
node08: off
node01: off
node06: off
node05: off
2: wait 1 minutes ,disconnect the PDU by turn off the switch for whole rack ( AC off )
3: wait for 3-5 minutes ,turn on the switch to PDU (AC on ) for whole rack
[root@mgt ~]# reventlog smm | grep -E "Error|error|Fail|fail|Corruption|corruption|ECC"
# should be no output from SMM SEL LOG
[root@mgt ~]# reventlog all | grep -E "Error|error|Fail|fail|Corruption|corruption|ECC"
# should be no output from XCC SEL LOG
step 1 to step 7 is call a AC Power cycle for rack ,repeat the AC power cycle for rack 5 times