About the calculation time #204
Unanswered
LongTIme1111
asked this question in
Q&A
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Hi all,
I'm doing a simulation of a rain landslide, but I'm confused by the calculation time. In Chapter 3, Soil Strip Compression Simulation. The estimated compression time is 2.5s, so the simulation loads 50 steps with a loading time of 0.05s, but the landslide I want to simulate occurs 30 hours after the rain starts, so how do I set the number of loading steps and the loading time of each step to calculate it the fastest.
Hope to get any reply,thanks
Beta Was this translation helpful? Give feedback.
All reactions