Skip to content

renepay: Support for BOLT12 #12107

renepay: Support for BOLT12

renepay: Support for BOLT12 #12107

Triggered via pull request January 29, 2025 09:43
Status Failure
Total duration 2h 27m 48s
Artifacts 4

ci.yaml

on: pull_request
Matrix: compile
Run fuzz regression tests
8m 55s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s

Annotations

32 errors
Sanitizers Test CLN (ASan/UBSan (06/10), --test-group=6 --test-group-count=10)
Process completed with exit code 1.
Sanitizers Test CLN (ASan/UBSan (03/10), --test-group=3 --test-group-count=10)
The job was canceled because "ASan_UBSan__06_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (02/10), --test-group=2 --test-group-count=10 -n 1)
The job was canceled because "ASan_UBSan__06_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (09/10), --test-group=9 --test-group-count=10)
The job was canceled because "ASan_UBSan__06_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (05/10), --test-group=5 --test-group-count=10)
The job was canceled because "ASan_UBSan__06_10__--test" failed.
Sanitizers Test CLN (ASan/UBSan (08/10), --test-group=8 --test-group-count=10)
The job was canceled because "ASan_UBSan__06_10__--test" failed.
Valgrind Test CLN Valgrind (03/10)
Process completed with exit code 1.
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
Valgrind Test CLN Valgrind (04/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (04/10)
The operation was canceled.
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
Valgrind Test CLN Valgrind (06/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (06/10)
The operation was canceled.
Valgrind Test CLN Valgrind (01/10)
The job was canceled because "Valgrind__03_10__--test-g" failed.
Valgrind Test CLN Valgrind (01/10)
The operation was canceled.
Test minimum supported BTC v25.0 with clang
The job running on runner GitHub Actions 51 has exceeded the maximum execution time of 120 minutes.
Test minimum supported BTC v25.0 with clang
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cln-compile-clang-sanitizers.tar.bz2 Expired
194 MB
cln-compile-clang.tar.bz2 Expired
131 MB
cln-compile-gcc-O3.tar.bz2 Expired
164 MB
cln-compile-gcc.tar.bz2 Expired
130 MB