How to set the cable between wind turbine and wind turbine #1403
Replies: 5 comments 3 replies
-
Dear @icnosvbovwb, I'm not familiar with this image, but are you referring to the modeling of a shared mooring system? My interpretation of your image is that the floating offshore wind turbines (FOWTs) on the perimeter are anchored to the seafloor and the FOWTs on the edges also interconnect with FOWT P1 via shared moorings. Are you trying to model this floating offshore wind farm in FAST.Farm? With the release of FAST.Farm in OpenFAST v3.3, FAST.Farm can now model floating offshore wind farms with shared moorings. Effectively, the mooring lines connecting FOWT P1 to the wind turbines on the edge of the perimeter are modeled in an instance of MoorDyn at the FAST.Farm level, and the mooring lines connecting the perimeter FOWTs to the seabed are modeled in instances of MoorDyn at the OpenFAST level. See the following pull request--including links to updated FAST.Farm, MoorDyn, and API documentation--for more information: #1086. Best regards, |
Beta Was this translation helpful? Give feedback.
-
Dear @jjonkman If so, what about 4X4? How do the middle 4 connect? |
Beta Was this translation helpful? Give feedback.
-
Dear @jjonkman |
Beta Was this translation helpful? Give feedback.
-
Dear @mattEhall |
Beta Was this translation helpful? Give feedback.
-
Dear @jjonkman |
Beta Was this translation helpful? Give feedback.
-
Dear everyone
How to set the link between the wind turbine and the wind turbine? For example, P1 wind turbine does not set the cable, and P8 fixed position sets the cable to P1 position. Is my understanding correct?