qt5 user level Data window (Trac #1117) #1162
Labels
Enhancement
Feature requests and/or general improvements
Major
Big change in the code or important change in behaviour
Milestone
If beta(Q) or some other special calculation method is being used then in addition to S(Q) need to store intermediates such as Soriginal(Q), Beta(Q), F(Q), F^2^(Q), and hide them if the user reverts to the simple calculation.
Save project or analysis, load project or analysis need to deal with the extra data arrays.
If we allow P1(Q)S1(Q) + P2(Q)S2(Q) this gets very messy.
Migrated from http://trac.sasview.org/ticket/1117
The text was updated successfully, but these errors were encountered: