Synthetic Texas 2000-bus power system model.
This is an entirely synthetic 2000 bus case, geographically situated
in the US state of Texas. The case is designed with a 500, 230, 161
and 115 kV transmission network to serve a load that roughly mimics
the actual population of its geographic footprint. The synthetic
transmission system was designed by algorithms described in [1] to be
statistically similar to actual transmission system models but without
modeling any actual lines.
When publishing results based on this data, please cite:
[1] A.B. Birchfield, T. Xu, K.M. Gegner, K.S. Shetye, T.J. Overbye,
"Grid Structural Characteristics as Validation Criteria for
Synthetic Networks," IEEE Transactions on Power Systems,
vol. 32, no. 4, pp. 3258-3265, July 2017.
doi: 10.1109/TPWRS.2016.2616385
This is a synthetic power system model that does not represent the
actual grid. It was developed as part of the US ARPA-E GRID DATA
research project and contains no CEII.
One-line diagrams and other data formats available at:
https://electricgrids.engr.tamu.edu
August 9, 2018