Pull Request Template
Use this template to quickly create a well written pull request. Delete all quotes before creating the pull request.
Please include a summary of the changes and which issue has been fixed. Please also include relevant motivation and context. List any dependencies that are required for this change Links to Notion, Figma or any other documents that might be relevant to the PR
Add a TL;DR when description is extra long (helps content team)
Fixes # (issue)
if no issue exists, please create an issue and ask the maintainers about this first
Media
A video or a GIF is preferred. when using Loom, don’t embed because it looks like it’s a GIF. instead, just link to the video
Please delete options that are not relevant.
- Bug fix (non-breaking change which fixes an issue)
- New feature (non-breaking change which adds functionality)
- Breaking change (fix or feature that would cause existing functionality to not work as expected)
- Chore (housekeeping or task changes that don't impact user perception)
- This change requires a documentation update
Please describe the tests that you ran to verify your changes. Provide instructions, so we can reproduce. Please also list any relevant details for your test configuration. Delete anything that is not important
- Manual
- Jest
- Cypress
Add Testsmith test cases links that relate to this PR
Link issues raised during DP testing for better visiblity and tracking (copy link from comments dropped on this PR)
- My code follows the style guidelines of this project
- I have performed a self-review of my own code
- I have commented my code, particularly in hard-to-understand areas
- I have made corresponding changes to the documentation
- My changes generate no new warnings
- I have added tests that prove my fix is effective or that my feature works
- New and existing unit tests pass locally with my changes
- PR is being merged under a feature flag
- Test plan has been approved by relevant developers
- Test plan has been peer reviewed by QA
- Cypress test cases have been added and approved by either SDET or manual QA
- Organized project review call with relevant stakeholders after Round 1/2 of QA
- Added Test Plan Approved label after reveiwing all Cypress test