Skip to content

e2e tests at push on Automattic/jetpack-production trunk branch #96194

e2e tests at push on Automattic/jetpack-production trunk branch

e2e tests at push on Automattic/jetpack-production trunk branch #96194

Triggered via repository dispatch January 1, 2025 17:19
@matticbotmatticbot
e2e tests at push on Automattic/jetpack-production trunk branch 4b52dc9
Status Cancelled
Total duration 2m 2s
Artifacts 5

e2e-tests.yml

on: repository_dispatch
Determine tests matrix
45s
Determine tests matrix
Matrix: build-projects
Matrix: e2e-tests
Test report
0s
Test report
Slack notification
0s
Slack notification
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 warning
Jetpack connection e2e tests
Canceling since a higher priority waiting request for 'e2e-tests-repository_dispatch-refs/heads/trunk-e2e tests at push on Automattic/jetpack-production trunk branch' exists
Jetpack connection e2e tests
Process completed with exit code 1.
Jetpack connection e2e tests
The operation was canceled.
Jetpack sync e2e tests
Canceling since a higher priority waiting request for 'e2e-tests-repository_dispatch-refs/heads/trunk-e2e tests at push on Automattic/jetpack-production trunk branch' exists
Jetpack sync e2e tests
The operation was canceled.
Jetpack sync e2e tests
Process completed with exit code 1.
Jetpack post editor e2e tests
Canceling since a higher priority waiting request for 'e2e-tests-repository_dispatch-refs/heads/trunk-e2e tests at push on Automattic/jetpack-production trunk branch' exists
Jetpack post editor e2e tests
The operation was canceled.
Jetpack post editor e2e tests
Process completed with exit code 1.
Jetpack post-connection e2e tests
Canceling since a higher priority waiting request for 'e2e-tests-repository_dispatch-refs/heads/trunk-e2e tests at push on Automattic/jetpack-production trunk branch' exists
Jetpack post-connection e2e tests
Process completed with exit code 1.
Jetpack post-connection e2e tests
The operation was canceled.
Jetpack pre-connection e2e tests
Canceling since a higher priority waiting request for 'e2e-tests-repository_dispatch-refs/heads/trunk-e2e tests at push on Automattic/jetpack-production trunk branch' exists
Jetpack pre-connection e2e tests
Process completed with exit code 1.
Jetpack pre-connection e2e tests
The operation was canceled.
Determine tests matrix
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
test-output-Jetpack connection
192 Bytes
test-output-Jetpack post editor
192 Bytes
test-output-Jetpack post-connection
192 Bytes
test-output-Jetpack pre-connection
192 Bytes
test-output-Jetpack sync
192 Bytes