chore(deps): update babel monorepo (patch) #5156
build-and-test-pr.yml
on: pull_request
Turbo Affected
/
Determine Affected
25s
Matrix: Test Mobile E2E / Ledger Live Mobile - Android Detox Tests
Matrix: Build Desktop / build-desktop-app
Build Mobile
/
Build LLM | Android
4m 35s
Build Mobile
/
Build LLM | iOS
4m 40s
Test Mobile
/
LLM CodeCheck
4m 51s
Test Design System
/
Design System Tests
1m 3s
Test Desktop
/
LLD Code Checks
4m 57s
Test Desktop
/
Desktop Unit Tests
4m 2s
Test Libraries
/
Test Libraries
1m 23s
Test Libraries
/
Codecheck Libraries
4m 21s
Test Libraries
/
Test Docs
1m 51s
Test Mobile E2E
/
Allure Reports Export on Server
0s
Matrix: Test Mobile E2E / Upload to Xray
Test Mobile E2E
/
Allure Reports Export on Server
0s
OK
0s
Annotations
17 errors and 1 warning
Test Mobile E2E / LLM - iOS Detox Tests
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Test Mobile E2E / LLM - iOS Detox Tests
The operation was canceled.
|
Build Mobile / Build LLM | iOS
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Build Mobile / Build LLM | iOS
The operation was canceled.
|
Build Desktop / Build LLD | win
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Test Mobile / LLM CodeCheck
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Test Mobile / LLM CodeCheck
The operation was canceled.
|
Build Desktop / Build LLD | mac
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Build Desktop / Build LLD | mac
The operation was canceled.
|
Build Mobile / Build LLM | Android
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Build Mobile / Build LLM | Android
The operation was canceled.
|
Test Desktop / Desktop Tests E2E (Ubuntu)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Test Desktop / Desktop Tests E2E (Ubuntu)
The operation was canceled.
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests (1, 1)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests (1, 1)
The operation was canceled.
|
Test Desktop / LLD Code Checks
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7596/merge' exists
|
Test Desktop / LLD Code Checks
The operation was canceled.
|
Test Mobile E2E / LLM - iOS Detox Tests
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2.93.0-sha.38efd2eed752decd6a037d40d8e1236ec8d9686d-linux-x86_64.AppImage
|
181 MB |
|
linux-js-bundle-metafiles
|
636 KB |
|
outputs-codecheck
|
298 Bytes |
|
outputs-test-libraries
|
157 Bytes |
|
outputs-test-ui
|
165 Bytes |
|