Sync with module template #16
main.yml
on: pull_request
Build, lint, and test
/
Prepare
1m 16s
Check workflows
5s
Matrix: Build, lint, and test / Build
Matrix: Build, lint, and test / Lint
Matrix: Build, lint, and test / Test
All jobs pass
1s
Annotations
6 errors
Build, lint, and test / Lint (20.x)
Process completed with exit code 127.
|
Build, lint, and test / Lint (18.x)
The job was canceled because "_20_x" failed.
|
Build, lint, and test / Lint (18.x)
The operation was canceled.
|
Build, lint, and test / Lint (16.x)
The job was canceled because "_20_x" failed.
|
Build, lint, and test / Lint (16.x)
The operation was canceled.
|
All jobs pass
Process completed with exit code 1.
|