Skip to content

Tests and linting

Tests and linting #519

Triggered via schedule November 1, 2023 03:04
Status Failure
Total duration 1m 34s
Artifacts

tests.yaml

on: schedule
Matrix: integration-tests
Matrix: unit-tests
Code style and static analysis
1m 17s
Code style and static analysis
Markdown link check
22s
Markdown link check
Tests finished
0s
Tests finished
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Integration tests (Selenium 3.141.59)
Process completed with exit code 2.
Integration tests (Selenium 4.10.0)
The job was canceled because "_3_141_59" failed.
Integration tests (Selenium 4.10.0)
The operation was canceled.