chore(deps): update golang docker tag to v1.21.4 #54
Triggered via pull request
November 8, 2023 02:32
Status
Failure
Total duration
6h 1m 3s
Artifacts
–
ci.yaml
on: pull_request
Matrix: Skaffold build CI base images
Matrix: Skaffold Build ci util images
Matrix: Skaffold Build product base images
Annotations
6 errors
Skaffold build CI base images (release-build-base, go-1.19, local-docker, linux/arm64)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
|
Skaffold build CI base images (release-build-base, go-1.19, local-docker, linux/arm64)
The operation was canceled.
|
Skaffold build CI base images (release-build-base, go-1.20, local-docker, linux/arm64)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
|
Skaffold build CI base images (release-build-base, go-1.20, local-docker, linux/arm64)
The operation was canceled.
|
Skaffold build CI base images (release-build-base, go-1.21, local-docker, linux/arm64)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
|
Skaffold build CI base images (release-build-base, go-1.21, local-docker, linux/arm64)
The operation was canceled.
|