Skip to content

Assignment update done #495

Assignment update done

Assignment update done #495

Triggered via push September 9, 2023 18:24
Status Cancelled
Total duration 2m 9s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

make.yml

on: push
call-build-container-vreapis  /  build
26s
call-build-container-vreapis / build
Matrix: call-build-container-vre-panel
Fit to window
Zoom out
Zoom in

Annotations

4 errors
call-build-container-vre-panel (production) / build
Process completed with exit code 1.
call-build-container-vre-panel (staging) / build
Process completed with exit code 1.
call-build-container-vre-panel (development) / build
FailFast: cancelling since parallel instance has failed
call-build-container-vre-panel (development) / build
The operation was canceled.