Clean up and fix for enroll button #535
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
make.yml
on: push
call-build-container-vreapis
/
build
28s
Matrix: call-build-container-vre-panel
Annotations
5 errors
call-build-container-vre-panel (staging) / build
Process completed with exit code 1.
|
call-build-container-vre-panel (development) / build
FailFast: cancelling since parallel instance has failed
|
call-build-container-vre-panel (development) / build
The operation was canceled.
|
call-build-container-vre-panel (production) / build
FailFast: cancelling since parallel instance has failed
|
call-build-container-vre-panel (production) / build
The operation was canceled.
|