merge upstream PR-24 to add UBX-NAV-RELPOSNED #78
Annotations
5 errors
build (--no-default-features)
Process completed with exit code 101.
|
build (--no-default-features --features alloc)
The job was canceled because "_--no-default-features" failed.
|
build (--no-default-features --features alloc)
Process completed with exit code 101.
|
build (--all-features)
The job was canceled because "_--no-default-features" failed.
|
build (--all-features)
The operation was canceled.
|