[Improve][Producer] Refactor internalSend() and resouce managment #196
ci.yml
on: pull_request
build
1m 21s
lint
2m 18s
Matrix: integration-tests
Annotations
8 errors
lint
Process completed with exit code 2.
|
integration-tests (1.19)
Process completed with exit code 2.
|
integration-tests (1.18)
The job was canceled because "_1_19" failed.
|
integration-tests (1.18)
The operation was canceled.
|
integration-tests (1.17)
The job was canceled because "_1_19" failed.
|
integration-tests (1.17)
The operation was canceled.
|
integration-tests (1.16)
The job was canceled because "_1_19" failed.
|
integration-tests (1.16)
The operation was canceled.
|