refactor: factor out prepareTransaction #203

refactor: factor out prepareTransaction

refactor: factor out prepareTransaction #203

Re-run triggered October 24, 2023 14:30
Status Failure
Total duration 11m 46s
Artifacts

ci.yml

on: pull_request
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
integration-tests (1.18)
Process completed with exit code 2.
integration-tests (1.17)
The job was canceled because "_1_18" failed.
integration-tests (1.17)
The operation was canceled.
integration-tests (1.19)
The job was canceled because "_1_18" failed.
integration-tests (1.19)
The operation was canceled.
integration-tests (1.16)
The job was canceled because "_1_18" failed.
integration-tests (1.16)
The operation was canceled.