Skip to content

Loosen the grpc dependency constraint #21

Loosen the grpc dependency constraint

Loosen the grpc dependency constraint #21

Triggered via push July 30, 2024 23:50
Status Failure
Total duration 2m 24s
Artifacts

go-testing.yml

on: push
Matrix: unit-tests-go
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Vagrant unit tests on Go (Ruby 3.3)
Process completed with exit code 1.
Vagrant unit tests on Go (Ruby 3.2)
The job was canceled because "_3_3" failed.
Vagrant unit tests on Go (Ruby 3.2)
The operation was canceled.
Vagrant unit tests on Go (Ruby 3.1)
The job was canceled because "_3_3" failed.
Vagrant unit tests on Go (Ruby 3.1)
The operation was canceled.
Vagrant unit tests on Go (Ruby 3.0)
The job was canceled because "_3_3" failed.
Vagrant unit tests on Go (Ruby 3.0)
The operation was canceled.