Skip to content

Various cleanups

Various cleanups #2494

Triggered via pull request December 2, 2023 12:24
@taiki-etaiki-e
synchronize #1045
taiki-e/dev
Status Cancelled
Total duration 12m 36s
Artifacts

ci.yml

on: pull_request
Matrix: features
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 2 warnings
test (stable, ubuntu-latest)
Process completed with exit code 101.
test (nightly, ubuntu-latest)
Process completed with exit code 101.
careful
Process completed with exit code 101.
test (1.61, ubuntu-latest)
Process completed with exit code 101.
test (nightly, windows-latest)
Process completed with exit code 101.
test (stable, windows-latest)
Process completed with exit code 101.
test (nightly, ubuntu-latest, i686-unknown-linux-gnu)
Process completed with exit code 101.
test (1.61, windows-latest)
Process completed with exit code 101.
test (nightly, ubuntu-latest, armv7-unknown-linux-gnueabihf)
Process completed with exit code 101.
test (nightly, ubuntu-latest, armv5te-unknown-linux-gnueabi)
Process completed with exit code 101.
miri
Canceling since a higher priority waiting request for 'CI-1045' exists
miri
The operation was canceled.
san
Canceling since a higher priority waiting request for 'CI-1045' exists
san
The operation was canceled.
test (nightly, ubuntu-latest, i686-unknown-linux-gnu)
Failed to download action 'https://api.github.com/repos/taiki-e/setup-cross-toolchain-action/tarball/e0fdbe18d70a8bbed8a44d3319a1842949a63671'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
test (nightly, ubuntu-latest, i686-unknown-linux-gnu)
Back off 12.372 seconds before retry.