Skip to content

Merge pull request #625 from csbrasnett/cys-logging #6

Merge pull request #625 from csbrasnett/cys-logging

Merge pull request #625 from csbrasnett/cys-logging #6

Triggered via push October 30, 2024 08:12
Status Failure
Total duration 44m 17s
Artifacts

run_tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
lint
Process completed with exit code 30.
build (3.9)
The job was canceled because "_3_12" failed.
build (3.9)
The operation was canceled.
build (3.11)
The job was canceled because "_3_12" failed.
build (3.11)
Codecov: Failed to properly create commit: The process '/home/runner/work/_actions/codecov/codecov-action/v4/dist/codecov' failed with exit code 1
build (3.10)
The job was canceled because "_3_12" failed.
build (3.10)
The operation was canceled.
build (3.12)
Codecov: Failed to properly create commit: The process '/home/runner/work/_actions/codecov/codecov-action/v4/dist/codecov' failed with exit code 1