DAOS-15964 test: verify daos_server_helper on server (#15503) #15599

Merged
merged 1 commit into from
Dec 18, 2024

Conversation

daltonbohning
Copy link
Contributor

verify daos_server_helper on server instead of the runner/client. misc cleanup

Skip-unit-tests: true
Skip-fault-injection-test: true

Required-githooks: true

Before requesting gatekeeper:

  • Two review approvals and any prior change requests have been resolved.
  • Testing is complete and all tests passed or there is a reason documented in the PR why it should be force landed and forced-landing tag is set.
  • Features: (or Test-tag*) commit pragma was used or there is a reason documented that there are no appropriate tags for this PR.
  • Commit messages follows the guidelines outlined here.
  • Any tests skipped by the ticket being addressed have been run and passed in the PR.

Gatekeeper:

  • You are the appropriate gatekeeper to be landing the patch.
  • The PR has 2 reviews by people familiar with the code, including appropriate owners.
  • Githooks were used. If not, request that user install them and check copyright dates.
  • Checkpatch issues are resolved. Pay particular attention to ones that will show up on future PRs.
  • All builds have passed. Check non-required builds for any new compiler warnings.
  • Sufficient testing is done. Check feature pragmas and test tags and that tests skipped for the ticket are run and now pass with the changes.
  • If applicable, the PR has addressed any potential version compatibility issues.
  • Check the target branch. If it is master branch, should the PR go to a feature branch? If it is a release branch, does it have merge approval in the JIRA ticket.
  • Extra checks if forced landing is requested
    • Review comments are sufficiently resolved, particularly by prior reviewers that requested changes.
    • No new NLT or valgrind warnings. Check the classic view.
    • Quick-build or Quick-functional is not used.
  • Fix the commit message upon landing. Check the standard here. Edit it to create a single commit. If necessary, ask submitter for a new summary.

@daltonbohning daltonbohning added clean-cherry-pick Cherry-pick from another branch that did not require additional edits release-2.6.3 Targeted for 2.6.3 labels Dec 11, 2024
@daltonbohning daltonbohning added this to the Release 2.6.3 milestone Dec 11, 2024
@daltonbohning daltonbohning self-assigned this Dec 11, 2024
Copy link

Ticket title is 'control/daos_server_helper.py: checker for helper on server instead of runner node'
Status is 'Awaiting backport'
Labels: 'GCP'
Job should run at elevated priority (1)
https://daosio.atlassian.net/browse/DAOS-15964

@github-actions github-actions bot added the priority Ticket has high priority (automatically managed) label Dec 11, 2024
@daosbuild1
Copy link
Collaborator

Test stage Functional Hardware Medium completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-15599/1/execution/node/936/log

@daosbuild1
Copy link
Collaborator

Test stage Functional Hardware Medium completed with status FAILURE. https://build.hpdd.intel.com//job/daos-stack/job/daos/view/change-requests/job/PR-15599/2/execution/node/936/log

verify daos_server_helper on server instead of the runner/client.
misc cleanup

Skip-unit-tests: true
Skip-fault-injection-test: true

Required-githooks: true

Signed-off-by: Dalton Bohning <[email protected]>
@daltonbohning daltonbohning force-pushed the dbohning/daos-15964-2.6 branch from ef50c40 to 5b73617 Compare December 18, 2024 17:55
@daltonbohning daltonbohning added the forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. label Dec 18, 2024
@daltonbohning daltonbohning marked this pull request as ready for review December 18, 2024 20:29
@daltonbohning daltonbohning requested review from a team as code owners December 18, 2024 20:29
@daltonbohning daltonbohning requested a review from a team December 18, 2024 20:29
@daltonbohning daltonbohning merged commit 142a112 into release/2.6 Dec 18, 2024
47 checks passed
@daltonbohning daltonbohning deleted the dbohning/daos-15964-2.6 branch December 18, 2024 20:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
clean-cherry-pick Cherry-pick from another branch that did not require additional edits forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. priority Ticket has high priority (automatically managed) release-2.6.3 Targeted for 2.6.3
Development

Successfully merging this pull request may close these issues.

3 participants