Skip to content

chore(deps): update dependency semantic-release to v24.1.2 #835

chore(deps): update dependency semantic-release to v24.1.2

chore(deps): update dependency semantic-release to v24.1.2 #835

Triggered via push October 1, 2024 00:53
Status Failure
Total duration 56s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 18)
Process completed with exit code 1.
test (ubuntu-latest, 20)
The job was canceled because "ubuntu-latest_18" failed.
test (ubuntu-latest, 20)
Process completed with exit code 1.
test (macOS-latest, 18)
The job was canceled because "ubuntu-latest_18" failed.
test (macOS-latest, 18)
The operation was canceled.
test (windows-latest, 20)
The job was canceled because "ubuntu-latest_18" failed.
test (windows-latest, 20)
The operation was canceled.
test (macOS-latest, 20)
The job was canceled because "ubuntu-latest_18" failed.
test (macOS-latest, 20)
The operation was canceled.
test (windows-latest, 18)
The job was canceled because "ubuntu-latest_18" failed.
test (windows-latest, 18)
The operation was canceled.