Skip to content

chore(deps): update dependency go to v1.23.5 (#259) #2029

chore(deps): update dependency go to v1.23.5 (#259)

chore(deps): update dependency go to v1.23.5 (#259) #2029

Triggered via push January 17, 2025 00:29
Status Failure
Total duration 2m 40s
Artifacts

build.yml

on: push
Matrix: build
build-status
0s
build-status
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (1.16)
Process completed with exit code 1.
build (1.17)
The job was canceled because "_1_16" failed.
build (1.17)
Process completed with exit code 1.
build (1.18)
The job was canceled because "_1_16" failed.
build (1.18)
The operation was canceled.