Skip to content

Bump golang.org/x/sync from 0.7.0 to 0.8.0 #9488

Bump golang.org/x/sync from 0.7.0 to 0.8.0

Bump golang.org/x/sync from 0.7.0 to 0.8.0 #9488

Re-run triggered November 5, 2024 15:25
Status Cancelled
Total duration 2m 43s
Artifacts

ci.yml

on: pull_request
Matrix: Run integration tests
Matrix: Run Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run integration tests (test-e2e-deployments)
The job was canceled because "test-e2e-serverless" failed.
Run integration tests (test-e2e-deployments)
The operation was canceled.
Run integration tests (test-e2e)
The job was canceled because "test-e2e-serverless" failed.
Run integration tests (test-e2e)
The operation was canceled.
Run integration tests (test-integration-poller)
The job was canceled because "test-e2e-serverless" failed.
Run integration tests (test-integration-poller)
The operation was canceled.
Run integration tests (test-e2e-serverless)
Process completed with exit code 2.