Bump golang.org/x/sync from 0.7.0 to 0.9.0 #9636
Triggered via pull request
November 19, 2024 14:14
Status
Failure
Total duration
15m 55s
Artifacts
–
ci.yml
on: pull_request
Lint
3m 20s
Build
1m 49s
Benchmark
9m 34s
Vendor check
1m 24s
Check jsonnet & tempo-mixin
55s
Build technical documentation
20s
Matrix: Run integration tests
Matrix: Run Unit Tests
Annotations
7 errors
Run integration tests (test-e2e-serverless)
Process completed with exit code 2.
|
Run integration tests (test-e2e-deployments)
The job was canceled because "test-e2e-serverless" failed.
|
Run integration tests (test-e2e-deployments)
The operation was canceled.
|
Run integration tests (test-e2e)
The job was canceled because "test-e2e-serverless" failed.
|
Run integration tests (test-e2e)
The operation was canceled.
|
Run integration tests (test-integration-poller)
The job was canceled because "test-e2e-serverless" failed.
|
Run integration tests (test-integration-poller)
The operation was canceled.
|