Skip to content

fix(plotter tests): deps flow #5419

fix(plotter tests): deps flow

fix(plotter tests): deps flow #5419

Triggered via push November 29, 2024 06:13
Status Failure
Total duration 12m 0s
Artifacts

ci.yml

on: push
Matrix: test-minimal-python
Matrix: test-core-python
Matrix: test-core-umap
Matrix: test-full-ai
Matrix: test-graphviz
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test-readme
Process completed with exit code 1.
test-core-python (3.11)
Process completed with exit code 1.
test-core-python (3.9)
The job was canceled because "_3_11" failed.
test-core-python (3.9)
The operation was canceled.
test-core-python (3.8)
The job was canceled because "_3_11" failed.
test-core-python (3.8)
The operation was canceled.
test-core-python (3.10)
The job was canceled because "_3_11" failed.
test-core-python (3.10)
The operation was canceled.
test-core-python (3.12)
The job was canceled because "_3_11" failed.
test-core-python (3.12)
The operation was canceled.