Skip to content

[SYCL] Optimize back-to-back ControlBarrier calls #13575

[SYCL] Optimize back-to-back ControlBarrier calls

[SYCL] Optimize back-to-back ControlBarrier calls #13575

Triggered via pull request January 23, 2025 15:44
Status Cancelled
Total duration 21m 5s
Artifacts

sycl-linux-precommit.yml

on: pull_request
detect_changes  /  Decide which tests could be affected by the changes
5s
detect_changes / Decide which tests could be affected by the changes
build_e2e_tests  /  run
build_e2e_tests / run
Decide which Arc tests to run
0s
Decide which Arc tests to run
Matrix: test-perf
Waiting for pending jobs
Matrix: run_prebuilt_e2e_tests
Waiting for pending jobs
Matrix: test
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build / Build + LIT
Canceling since a higher priority waiting request for 'SYCL Pre Commit on Linux-16750' exists
build / Build + LIT
Process completed with exit code 1.
build / Build + LIT
The operation was canceled.