Skip to content

[SYCL] Optimize back-to-back ControlBarrier calls #13403

[SYCL] Optimize back-to-back ControlBarrier calls

[SYCL] Optimize back-to-back ControlBarrier calls #13403

Triggered via pull request January 23, 2025 16:05
Status Cancelled
Total duration 11m 25s
Artifacts

sycl-windows-precommit.yml

on: pull_request
detect_changes  /  Decide which tests could be affected by the changes
8s
detect_changes / Decide which tests could be affected by the changes
e2e  /  run
e2e / run
Fit to window
Zoom out
Zoom in

Annotations

2 errors
build / Build + LIT
Canceling since a higher priority waiting request for 'SYCL Pre Commit on Windows-16750' exists
build / Build + LIT
The operation was canceled.