Skip to content

chore: Prepare release 0.39.1 #556

chore: Prepare release 0.39.1

chore: Prepare release 0.39.1 #556

Triggered via push January 18, 2024 18:31
Status Failure
Total duration 3m 21s
Artifacts

ci.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
quality
Process completed with exit code 1.
tests (macos-latest, 3.8)
Process completed with exit code 1.
tests (macos-latest, 3.10)
The job was canceled because "macos-latest_3_8" failed.
tests (macos-latest, 3.10)
A task was canceled.
tests (macos-latest, 3.9)
The job was canceled because "macos-latest_3_8" failed.
tests (macos-latest, 3.9)
The operation was canceled.
tests (ubuntu-latest, 3.12)
The job was canceled because "macos-latest_3_8" failed.
tests (ubuntu-latest, 3.12)
The operation was canceled.