Skip to content

maven central

maven central #24

Triggered via push June 11, 2024 18:33
Status Failure
Total duration 1m 27s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 3 warnings
build (ubuntu-latest)
Process completed with exit code 1.
build (macos-14)
The job was canceled because "ubuntu-latest" failed.
build (macos-14)
The operation was canceled.
build (macos-12)
The job was canceled because "ubuntu-latest" failed.
build (macos-12)
The operation was canceled.
build (macos-12)
gcc 14.1.0 is already installed and up-to-date. To reinstall 14.1.0, run: brew reinstall gcc
build (macos-12)
autoconf 2.72 is already installed and up-to-date. To reinstall 2.72, run: brew reinstall autoconf
build (macos-12)
libtool 2.4.7 is already installed and up-to-date. To reinstall 2.4.7, run: brew reinstall libtool