Skip to content

Commit

Permalink
Merge pull request #151 from B-Maes/master
Browse files Browse the repository at this point in the history
update doc consequential
Really nice, thanks @B-Maes
  • Loading branch information
romainsacchi authored Feb 14, 2024
2 parents d729ab0 + f0a6335 commit 24cbe40
Show file tree
Hide file tree
Showing 4 changed files with 16 additions and 8 deletions.
Binary file added docs/Baseline.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Binary file added docs/Measure_methods.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Binary file modified docs/Time_interval.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
24 changes: 16 additions & 8 deletions docs/consequential.rst
Original file line number Diff line number Diff line change
Expand Up @@ -58,7 +58,7 @@ a market are:
Range time
^^^^^^^^^^

Integer. Years. Used for single occurrences or short-lasting changed in demand (less than 3 years).
Integer. Years. Used for single occurrences or short-lasting changes in demand (less than 3 years).
Since the duration of the change is too short to measure a trend,
the trend is instead measured around the point where the additional
capital will be installed. A range of n years before and after the point
Expand Down Expand Up @@ -106,6 +106,8 @@ If True, the capital replacement rate is used as baseline.
The capital replacement rate is equal to -1 divided by
the lifetime (in years) of the technology.

.. image:: Baseline.png

If you wish to modify the default lifetime values used for the different
technologies, you can do so by modifying the file:

Expand All @@ -115,13 +117,19 @@ Measurement method
^^^^^^^^^^^^^^^^^

0 to 4.

* 0 = slope,
* 1 = linear regression,
* 2 = area under the curve,
* 3 = weighted slope,
* 4 = time interval is split in individual years and measured

method 0 and 1 are used if the production volume follows an almost linear pattern.
method 2 to 4 are used if the production volume follows a non-linear pattern.
Short-lasting changes tend to follow a linear pattern, whereas long-lasting changes often do not.

* 0 = slope: Default method, also used by ecoinvent,
* 1 = linear regression: Outliers have less of an effect on the results than with method 0,
* 2 = area under the curve: Used if there is an emphasis on the consequenses in the short term. e.g. if for the study it is important to also know “when” to best introduce the change,
* 3 = weighted slope: Curvature is determined using two slopes. First, the slope used in method 0. Second, a shorter slope, which by default is placed at the end of the time interval.The ratio
of the short and long slope is used to adjust the calculated values of method 0. By placing the shorter slope at the end, exponential growth curves are favored. Used if there is an emphasis
on the consequences in the long term. e.g if the focus of the study is on reaching net zero 2050,
* 4 = time interval is split in individual years and measured: The more balanced approach out of the three non-linear methods. Short, mid and long term developments are equally important

.. image:: Measure_methods.png