Skip to content

fix(deps): Bump org.jlleitschuh.gradle.ktlint from 11.6.1 to 12.1.2 #561

fix(deps): Bump org.jlleitschuh.gradle.ktlint from 11.6.1 to 12.1.2

fix(deps): Bump org.jlleitschuh.gradle.ktlint from 11.6.1 to 12.1.2 #561

Triggered via pull request December 30, 2024 03:45
Status Failure
Total duration 56s
Artifacts

ci.yml

on: pull_request
Matrix: ci / test
release  /  release
release / release
release  /  Publish documentation
release / Publish documentation
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 3 warnings
ci / java17-ubuntu-latest
Process completed with exit code 1.
ci / java17-windows-latest
The job was canceled because "ubuntu-latest" failed.
ci / java17-windows-latest
The operation was canceled.
ci / java17-macos-latest
The job was canceled because "ubuntu-latest" failed.
ci / java17-macos-latest
The operation was canceled.
ci / java17-ubuntu-latest
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
ci / java17-ubuntu-latest
Failed to generate PR comment. HttpError: Resource not accessible by integration Please ensure that the 'pull-requests: write' permission is available for the workflow job. Note that this permission is never available for a workflow triggered from a repository fork.
ci / java17-macos-latest
Failed to generate PR comment. HttpError: Resource not accessible by integration Please ensure that the 'pull-requests: write' permission is available for the workflow job. Note that this permission is never available for a workflow triggered from a repository fork.