Fix UB on out-of-bounds insert() #157
main.yml
on: pull_request
Matrix: Build/Test
no_std
11s
Result
0s
Annotations
3 errors and 4 warnings
Build/Test (nightly, ubuntu-latest)
Process completed with exit code 1.
|
Build/Test (stable, ubuntu-latest)
The job was canceled because "nightly_ubuntu-latest" failed.
|
Build/Test (stable, ubuntu-latest)
The operation was canceled.
|
Build/Test (1.36.0, ubuntu-latest)
Failed to download action 'https://api.github.com/repos/dtolnay/rust-toolchain/tarball/be73d7920c329f220ce78e0234b8f96b7ae60248'. Error: The SSL connection could not be established, see inner exception.
|
Build/Test (1.36.0, ubuntu-latest)
Back off 14.153 seconds before retry.
|
Build/Test (1.36.0, ubuntu-latest)
Failed to download action 'https://api.github.com/repos/dtolnay/rust-toolchain/tarball/be73d7920c329f220ce78e0234b8f96b7ae60248'. Error: The SSL connection could not be established, see inner exception.
|
Build/Test (1.36.0, ubuntu-latest)
Back off 16.703 seconds before retry.
|