Merge of several PRs into single one #30
Triggered via pull request
January 9, 2024 09:31
Status
Failure
Total duration
7h 35m 14s
Artifacts
1
CI-taptests-groups.yml
on: pull_request
Annotations
1 error and 10 warnings
run / tests (tests)
Process completed with exit code 1.
|
cache / builds (centos7)
Cache save failed.
|
cache / builds (centos6)
Cache save failed.
|
cache / builds (debian11)
Cache save failed.
|
cache / builds (fedora37, -clang)
Cache save failed.
|
cache / builds (ubuntu22, -clang)
Cache save failed.
|
cache / builds (ubuntu22, -tap)
Cache save failed.
|
cache / builds (ubuntu22, -tap)
Cache save failed.
|
cache / builds (ubuntu22, -tap)
Cache save failed.
|
cache / builds (ubuntu22, -tap)
Cache save failed.
|
run / tests (tests)
There are over 10,000 files in this artifact, consider creating an archive before upload to improve the upload performance.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
CI-taptests-groups-3fb0fbf463eee816adb12c70f958ac5a3db37846-run#30-tests
Expired
|
17.1 GB |
|