Skip to content

Upstream patches

Upstream patches #541

Triggered via pull request September 13, 2023 08:34
Status Cancelled
Total duration 14m 14s
Artifacts 2
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: pull_request
Matrix: Linux
Matrix: macOS
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Linux (arm-12)
Canceling since a higher priority waiting request for 'build-158' exists
Linux (arm-12)
The operation was canceled.
Linux (risc-v)
Canceling since a higher priority waiting request for 'build-158' exists
Linux (risc-v)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
linux-builds Expired
17.1 MB
source-bundle Expired
328 MB