Skip to content

Init

Init #1

Triggered via push September 2, 2024 23:00
Status Failure
Total duration 1m 10s
Artifacts

check.yml

on: push
Matrix: psalm
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
infection
Process completed with exit code 1.
test (8.1, lowest)
Process completed with exit code 255.
test (8.2, highest)
The job was canceled because "_8_1_lowest" failed.
test (8.1, highest)
The job was canceled because "_8_1_lowest" failed.
test (8.1, highest)
The operation was canceled.
psalm (lowest)
Process completed with exit code 255.