Skip to content

chore(deps): update ghcr.io/orange-opensource/hurl docker tag to v5 #1665

chore(deps): update ghcr.io/orange-opensource/hurl docker tag to v5

chore(deps): update ghcr.io/orange-opensource/hurl docker tag to v5 #1665

Triggered via pull request September 4, 2024 07:21
Status Success
Total duration 2m 27s
Artifacts 6

tests.yml

on: pull_request
Validate OpenAPI schemas
15s
Validate OpenAPI schemas
Lint and build the frontend
37s
Lint and build the frontend
Run GolangCI-lint
52s
Run GolangCI-lint
Run unit-tests (Go)
1m 6s
Run unit-tests (Go)
Build the docker image
1m 8s
Build the docker image
Check for GitLeaks
5s
Check for GitLeaks
Matrix: build-app
Scan the docker image
22s
Scan the docker image
Docker image End-to-End tests
14s
Docker image End-to-End tests
Matrix: e2e-test-app
Fit to window
Zoom out
Zoom in

Annotations

3 warnings
Build the app (linux / amd64)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Build the app (darwin / amd64)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Build the app (windows / amd64)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
docker-image Expired
5.37 MB
frontend-dist Expired
198 KB
tarampampam~webhook-tester~LB5RVV.dockerbuild
28.1 KB
webhook-tester-darwin-amd64 Expired
5.49 MB
webhook-tester-linux-amd64 Expired
5.37 MB
webhook-tester-windows-amd64 Expired
5.55 MB