Hamza Remmal :
In this sprint, we've finished the app and I've worked on the final look of the authentication. It was pretty long to do. This sprint was pretty tought as we had many other functionalities and a big problem with the testing. I've also added some views in case of an error during authentication to help the user. I've added mail validation too.
Adam Mernissi Arifi : This sprint , I've designed a better UI design for the dialog boxes for creating a post and for the different features of location(there's a picture in a comment in the pull request).I also managed to make the location features easier to understand and more intuitive .Overall, I think I did well and worked way more than 1 week workload.
Aymane Lamyaghri : For this sprint, I designed and implemented the User Interface for the profil fragment, I also designed and added the User Interface of the search fragment where I designed the posts in the app, I also connected the DataBase to some features that we had and deleted the hardcoded values that we had previously.Concerning my time estimate , my estimations were close enough to the real time I spent on each task.
Mehdi Ziazi : In this Sprint, I made the weather api robust to errors and linked the posts cache to the app for the offline mode requirement.
Abdessalam Derouich : In this last sprint i connected all the work that was done in previous sprints to the database, this resulted in a low coverage since many tests were not designed for the connected version of the app, but the dev team made sure to remedy to that. I also fixed the user search fragment of the app and made the chat app more realistic. since this was the last sprint and many fixes needed to be made I didn't bother to count the hours i spent in the sprint that by far exceeded my estimation (for 2 weeks, so Imagine 1).