-
Notifications
You must be signed in to change notification settings - Fork 3
XSB1107
(Jip) Willem Wijnia edited this page Jun 6, 2024
·
2 revisions
Eruya-leatoh Tech 1 Hydroelectric Power Generator |
|
---|---|
Source: | Total Mayhem |
Unit ID: | xsb1107 |
Faction: | Seraphim |
Tech level: | 1 |
Health: | 1920 |
Armour: | Structure |
Build restriction: | Hydrocarbon |
Energy cost: | 800 |
Mass cost: | 160 |
Build time: | 400 |
Energy production: | 150/s |
Vision radius: | 10 (200 m) |
Water vision radius: | 10 (200 m) |
Motion type: | RULEUMT_None |
Buildable layers: | water |
"Eruya-leatoh" is a Seraphim structure unit included in Total Mayhem. It is classified as a tech 1 hydroelectric power generator unit.
Hover over abilities to see effect descriptions.
- Naval
This unit counts as SIZE12
for adjacency effects from other structures. This theoretically means that it can be surrounded by exactly 12 structures the size of a standard tech 1 power generator, which is accurate; meaning it can get the maximum intended buff effects. The adjacency bonus HydrocarbonAdjacencyBuffs
is given by this unit.
Categories : SERAPHIM · TECH1 · NAVAL · ECONOMIC · STRUCTURE |
[Show] Total Mayhem