-
Notifications
You must be signed in to change notification settings - Fork 23
SEB9101
Balthazar edited this page Jul 22, 2024
·
6 revisions
![]() ![]() Tech 1 Research Center |
|
---|---|
![]() |
|
Source: | Research & Daiquiris - LOUD Edition |
Unit ID: | seb9101 |
Faction: | UEF |
Tech level: |
![]() |
Health: |
![]() |
Armour: | Structure |
Energy cost: |
![]() |
Mass cost: |
![]() |
Build time: | 250 (Details) |
Build rate: |
![]() |
Vision radius: | 10 (200 m) |
Water vision radius: | 10 (200 m) |
Motion type: | RULEUMT_None |
Buildable layers: | Land |
Wreckage: |
![]() ![]() |
"Tyson Campus" is a UEF structure unit included in Research & Daiquiris - LOUD Edition. It is classified as a tech 1 research center unit.
Contents
- Upgradeable
This unit counts as SIZE16
for adjacency effects from other structures. This theoretically means that it can be surrounded by exactly 16 structures the size of a standard tech 1 power generator, which is accurate; meaning it can get the maximum intended buff effects.
Build times and rate include EvenFlow.
-
00:50 ‒
50/s ‒
5/s — Built by Tech 1 Engineering Drone
-
00:10 ‒
250/s ‒
25/s — Built by Tech 1 Engineering Drone
-
00:05 ‒
500/s ‒
50/s — Built by Experimental Reconstruction Engineer (Technology Reclaimer)
-
00:16 ‒
150/s ‒
15/s — Built by Drone
-
00:25 ‒
100/s ‒
10/s — Built by Armored Command Unit
-
00:25 ‒
100/s ‒
10/s — Built by Armored Command Unit
The following orders can be issued to the unit:
![]() |
![]() |
It can be upgraded into the Tech 2 Research Center.
It has the build category BUILTBYTIER1RESEARCH UEF
.
Categories : UEF · TECH1 · FACTORY · STRUCTURE |
LOUD Wiki Home |
---|
[Show] Other Topics
Unit pages |
---|
[Show] LOUD
[Show] BlackOps Unleashed Units for LOUD
[Show] BrewLAN for LOUD
[Show] Total Mayhem for LOUD
[Show] Wyvern Battle Pack for LOUD